Construction Inspection
We confirm the work is built correctly before you accept it. What you sign off on at handover is what CDC tests months later.
Learn moreCruise Vessel Public Health Inspection
Built Right. Compliant In Service.
Two independent inspections of your vessel's public-health areas: construction at handover, operational at sea, or both. One inspector with 40 years across both disciplines.
What We Do
We confirm the work is built correctly before you accept it. What you sign off on at handover is what CDC tests months later.
Learn moreWe inspect your vessel at sea, at full operation: the condition CDC will eventually test, not the scaled-back port inspection.
Learn moreWho Does The Work
Forty years working aboard cruise ships: first as a ship's physician and medical director, then as one of the longest-tenured public-health inspectors in the industry. Both disciplines. Full scope.
I check whether it's built right and whether it will last in service — I've spent forty years learning the difference.— Dr. Luis Nodarse
Full Scope
We inspect across all eight public-health areas defined by the VSP 2025 standards. Every area. Every visit.
Galleys, pantries, bars, buffets, warewash
Pools, whirlpools, spa
Bunkering, distribution, Legionella control
Cabins, public toilets, sanitation procedures
GI surveillance, OPP compliance, inspected by a licensed physician
Rat guards, harborage, IPM logs
Surface sanitation, handwash compliance
Filters, condensate, showerheads, misting systems
Every inspection is tailor-made to the vessel. Findings from one ship are never applied to another.
The Deliverable
Every inspection closes with a written report within 24 hours. Located by deck and area. Scored by severity. A corrective action for every finding.
Hot-holding unit measured 119°F: below the 135°F minimum for prepared foods. Recalibrate and re-verify before service.
Handwash station obstructed by storage; not freely accessible. Clear access and confirm soap and towel supply.
Sneeze-guard gap exceeds tolerance at two stations. Adjust shielding to spec at next turnaround.
Two cases stored directly on the deck. Raise to 6″ clearance and label the storage zone.
GI surveillance log, isolation protocol, and OPP compliance verified by licensed physician. No findings.